Lisa Wang
17 يوليو 2024
[Location] The project is located at the intersection of Provincial Road S239, G25 Changshen Expressway, and G40 Yangli Expressway, adjacent to Liyang's thousand-ton-level port. The area has very convenient water and land transportation.
[Area] The total land area is 752 acres, with a total construction area of 486,000 square meters. Phase 1 covers an area of 378 acres, with a construction area of 228,000 square meters.
[Project Introduction] This project officially started in June 2022, and began delivering facilities to clients in January 2023. It has been included in Liyang's "14th Five-Year Plan" for the development of the modern logistics industry and is listed as a key provincial development project for 2022.
[Structure] Single-story brick-concrete mechanical workshop.
[Ceiling Height] 14.8 meters, with a crane height of 9 meters.
[Cranes] Can accommodate cranes up to 32 tons, with a standard configuration of 10-ton cranes.
[Area] Each building has four spans totaling 14,000 square meters, and can be subdivided from 3,500 square meters for lease.
[Features] The park has spacious roads, and 17.5-meter trucks can enter the workshops.
[Power Supply] 35,000 KVA, with power distribution available as needed.
[Price] Negotiable, with policy-related incentives and subsidies available for relevant industries.
[Industries] Stainless steel and metal materials processing center, intelligent manufacturing processing center, new materials and new energy processing center, aerospace materials, new energy vehicle materials, biopharmaceutical materials, high-performance structural materials, and more.